中国建越南首列城市铁路进入全面调试阶段
中国建越南首列城市铁路进入全面调试阶段

Vietnam’s first urban railway, constructed by China Railway Sixth Group Co. Ltd, started final test runs on Wednesday, August 1st.
The Cat Linh-Ha Dong urban rail line in Vietnam’s Hanoi capital started test runs with full electricity system on Wednesday. Over 100 representatives(代表) from Vietnamese and foreign news agencies in Vietnam and from the Chinese contractor boarded a four-carriage train to experience and evaluate its operation.
As the air-conditioned green train smoothly moved on track, passengers turned more and more excited. “It is very cool, clean and well-organized. I am so happy that I was one of its first informal passengers,” Tran Tuan Hiep, a 37-year-old staff of a news agency in Hanoi told Xinhua about his first impression.
Inside the China-made train, there are designated areas for people with mobility disabilities. Seats for the elderly, pregnant women and children are highlighted in yellow color, while steel holders are there to make sure safe positions for standing passengers. “It runs quite smoothly. I feel secure and relaxed,” Hiep said with a bright smile, adding that he would travel to work by urban train if its fare was reasonable.
The project has undergone a number of separated test runs on different categories since July. It will start running on trial basis, which welcomes local residents, in October. With a total length of around 13 km running through 12 stations, Cat Linh-Ha Dong Line connects the three districts of Ha Dong, Thanh Xuan and Dong Da. Its construction started in 2011. The railway will operate 13 four-carriage trains that will run every two minutes at speeds of between 35 and 80 km per hour.

本时文内容由奇速英语国际教育研究院原创编写,未经书面授权,禁止复制和任何商业用途,版权所有,侵权必究!(投稿及合作联系:028-84400718   QQ:757722345)

1.The passengers on the train don’t include _____.

A workers from the Chinese contractor

B workers from foreign news agencies

C workers from Vietnamese news agencies

D local Vietnamese

解析:选D。细节理解题。根据第二段第一句Over 100 representatives from Vietnamese and foreign news agencies in Vietnam and from the Chinese contractor boarded a four-carriage train to experience and evaluate its operation.可知车上乘客包括越南新闻机构的工作人员、外国新闻机构的工作人员以及中国承建方的工作人员,不包含越南当地民众,故选D。

2.What does the underlined word “evaluate” mean in Chinese?

A 设计.

B 评价.

C 预测.

D 修改.

解析:选B。词义猜测题。根据常理及第四段和第五段内容可知工程完成后是要对工程进行测试和评价验收,故选B。

3.How can you keep your position if you are standing on the train?

A Stand by the yellow seats.

B Stand in the area for the people with mobility disabilities.

C Hold the steel holders.

D Keep your legs apart.

解析:选C。细节理解题。根据第四段第二句Seats for the elderly, pregnant women and children are highlighted in yellow color, while steel holders are there to make sure safe positions for standing passengers.可知黄色位置是老弱病残专座,铁质拉手才是给站立的人设置的,因此为了站稳,你需要抓住拉手,故选C。

4.When will the line first be put into operation?

A In July.

B In August.

C In October.

D In December.

解析:选C。细节理解题。根据最后一段段第二句It will start running on trial basis, which welcomes local residents, in October.可知列车将于10月进行试运营,故选C。

5.How long will you wait for at most before the train arrives?

A 2 minutes.

B 10 minutes.

C 23 minutes.

D 26 minutes.

解析:选A。细节理解题。根据最后一段The railway will operate 13 four-carriage trains that will run every two minutes at speeds of between 35 and 80 km per hour.可知这条线路包含13列列车,每列4节车厢,每2分钟将有一列列车,因此你最多等两分钟就能坐上车,故选A。