1.The Futian Railway Station lies in _______.
A Shenzhen
B Hong Kong
C Guangzhou
D Xiamen
解析:选A。细节理解题。根据第一段第一句The construction of Asia’s largest underground high-speed railway station has been finished in Shenzhen.可知,故选A。
2.The underlined phrase “put into operation” means _______ in Chinese.
A 动手术
B 开动
C 运营
D 开刀
解析:选C。词义猜测题。文章关键词是“火车站”,而火车站投入使用自然是“运营”,故选C。
3.How much time will it take from Guangzhou to Kowloon district in 2016?
A 33 minutes.
B 45 minutes.
C 70 minutes.
D 78 minutes.
解析:选D。数字计算题。根据第二段内容可知福田地下火车站投入使用后广州到福田的时间是33分钟,而福田到香港九龙的时间是45分钟,所以广州到香港九龙的时间应该是78分钟,故选D。
4.The Futian Railway Station is the _______ underground station in China.
A largest
B second largest
C third largest
D fourth largest
解析:选A。推理判断题。既然是亚洲最大的地下火车站,自然是中国最大的了,故选A。
5.The Futian Railway Station is as large as 21 _______ fields.
A basketball
B football
C golf
D badminton
解析:选B。细节理解题。根据第三段第二句It is as large as 21 football fields.可知,故选B。